Menu
About Pilosio
Formwork
Scaffolding
Events
Trench lining
Services
Projects
News
Contacts
Contacts
Work with us
en
English
Italiano
Proud of our work
Industrial constructions
Infrastructures
Civil construction
Industrial maintenance
Entertainment
Restoration
Shipyards
Home
›
Case histories
›
Civil construction
Industrial constructions
Waste to energy plant
Pilosio MP scaffolding for the construction of Caspian Waterfront Mall
MP scaffolding for geodesic dome construction
Control Tower
Bonnybrook – Wastewater treatment plant headworks facility
Infrastructures
Viaduct demolition
Gallery construction
Railway Underpass
Movable system for the casting on site of pipelines.
MP shoring structures for the construction of viaduct wings.
Construction of two viaducts for the highway off-ramps.
High speed rail viaduct
Mohammed al Baquir bridge
First abutment of bridge by Arch. Calatrava
Bridge construction
N2-M41 Mount Edgecombe Interchange
Civil construction
Hockey Arena Ice Palace
St. Anna and St. Sebastian hospital
Isozaki Tower
Madinah Al Haram expansion project
Industrial maintenance
Chemical plant construction
Husky oil project
Entertainment
Stage for the Festival “Aria di Festa”
Genoa Boat Show
Restoration
Viaduct demolition
Roof restoration
Matera Cathedral restoration
Shipyards
Pilosio Temporary Roofing for Naval Sector