• PRG – Rail Guided System

    safe, robust and efficient

Explore
more

Rail Guided Climbing System

Pilosio Rail Guided System provides a safe climbing formwork, with fast repositioning by crane.

In this system the whole unit is guided to the structure at all times, even when being repositioned.

The whole unit can be repositioned safely and easily in one single lift even in windy conditions.

  • Civil constructions
  • Residential buildings
  • High-rise buildings
  • Maximum pouring height 4.5 m
  • Travelling profile H300R allows up to 70 cm of panel retracting